Duration:- 60+ Hrs
Tool used:- Synopsys
Completion Certificate provided.
Importance of Timing Analysis, VLSI Flow Introduction & different stages where Timing analysis happen
Different component of Timing analysis (Timing Budgeting,Timing Constraint,Timing Check,Timing Violations,Fixing of Timing Violations
Introduction about different input and output files for STA
Importance of Timing Arc & Timing Arc Representation in .LIB Files
Introduction of Delay Concepts
Combinational Path Delays,Sequential Path Delays
Net Delay basic (Metal Wire Concepts,Metal Stack concepts)
Gate Delay Concepts (Charging & Discharging concepts, Load related Concepts, Delay dependency on current of Inverter,Internal Capacitance,Input Capacitance and Output Capacitance concepts
Gate Delay Models (How delay depends on Input Transition & Output Load,NLDM Library & CCS Library)
Net Delay Models (Transmission Line Models,Elmore Model,Wire Load Model
Delay Calculation by STA tools (Path based Analysis and Graph Based Analysis)
Pre-Layout Delay (using wire-load model) & Post layout Delay (using SPEF File) calculation
Delay Calculation using Delay tables, Complexity across different corners.
Dependency of Delay on different parameters (PVT Corners,Manufacturing defects,RC Corners)
Various Timing Paths (Data Path, Clock Path, Asynchronous Path,Clock Group Introduction
Representation of Timing path within Timing report
Timing Exceptions (False path, Multicycle path)
Clock Constraints,Input and Output Delay constraints
Different Timing Terminology (launch/Capture path,Slew, Clock latency,Clock skew)
Setup and Hold Time
Setup and Hold Check and corresponding Equations
Basic Timing Report
Gloabal Setup-hold time
Onchip Variations (OCV),Advance onchip Variation (AOCV),Setup and Hold Check in case of OCV, AOCV
CRP & CRPR
Multi-Mode Multi-Corner timing analysis
Pre-placement (After synthesis) optimization
Pre-CTS (during or after placement or floorplaning) optimization
Fixing of Setup and Hold Violation at Logic Synthesis (front-end vlsi)
Post CTS or Pre-Route (After CTS)Optimization
Signoff Timing or Post-Route (After Routing) Timing Closure
Puneet Mittal – 17+ Years of Industry Experience & 5+ Years of Entrepreneur Experience. He is the Founder and CEO of VLSI Expert Pvt. Ltd.
LinkedIn Profile - https://www.linkedin.com/in/mittalpuneet
